A tile-to-Colorbond conversion is one of the main re-roofing jobs we do. It is a full replacement, not a repair, so it is worth knowing what it involves before anyone quotes it. This is the job in the order it happens.
When a conversion makes sense
- Tiles are cracking or delaminating across whole sections, not just in a few spots.
- The roof has been patched repeatedly, with a new leak in a different place each year.
- An old tile roof is heavy for the frame under it, which matters on Federation and Victorian houses.
- A low-pitch roof has never stopped leaking. Tile was never the right covering for a low pitch, and Colorbond with Speed-Deck can be sheeted to suit it.
If the tiles themselves are sound and it is the ridge bedding and pointing that has failed, a conversion is usually more than the roof needs. Read repoint or replace a tile roof first, because repair is the right answer more often than people expect.
What happens, step by step
- The old tiles are stripped and removed from site, working in sections so the house is not left open overnight.
- The frame and battens are inspected. Anything rotted or damaged is repaired or replaced before a new roof goes on top of it.
- New sarking is laid throughout. It sits under the roof covering, which is why it goes in as part of the re-roof rather than as a separate job.
- The roof is sheeted in Colorbond, with Speed-Deck where the pitch is low.
- New flashings, capping, gutters and downpipes are fitted, and all the trade waste leaves site with the crew.
Why the weight matters
Colorbond is much lighter than tile. On an older house, taking that weight off the frame is often the main reason to convert, and it is why the frame inspection is not optional: the time to find a sagging or rotted section is while the roof is off, not after the new sheets are on.
How long it takes
For a typical Inner West house, usually three to five working days once work starts, weather permitting. Terraces with difficult access, or roofs where rotted framing turns up underneath, can run longer. You are told if that looks likely before you commit.
What decides the cost
We do not put a figure on a conversion without seeing the roof, because the price moves with the size and shape of the roof, how much frame and batten repair turns up once the tiles are off, the pitch, how hard the roof is to reach, and how many valleys, penetrations and gutters need new flashing and fittings. After an inspection you get a written, fixed-price quote before any work starts. The inspection and the quote are free.